Brooklyn Bridge Rehabilitation
Integrity was asked to participate on the project based on previous experience and knowledge of knowing how important it is to make sure the surface preparation and the coating process was performed correctly on thousands of square feet of material. The relationship Integrity established with the steel manufacturer and the coating facility ensured that the product was being delivered to the job site on time and within the job specification.